Client: Leighton Contractors
Project name: Solomon Office Refurbishment
Location: 60km north of Tom Price in the Pilbara Region
Project timeline: 8 weeks
Description:
Leighton Contractors awarded McNally Contracting the refurbishment of a 14
floor office building. The old rundown office was transformed into an exceptional workspace that improved the overall office environment within the camp.
The works included:
- Design drawings detailing construction works
- Removal of existing walls, floor coverings and internal paneling
- Supply and installation of new floor coverings, internal stud walls, internal full height glass walls, internal paneling, external cladding, internal communication ports and cabling
- Installation of internal power points and cabling
- Replacement of all internal and external lights
- Installation of emergency / exit lighting
- Supply and installation of new distribution board for all electrical requirements
- Supply, installation and commissioning of all split system air conditioners
- Supply and installation of kitchen in office including all potable and grey water lines